We plan and meticulously design your requirements to achieve the project goals and objectives.
A brief outlook on the type of projects we specialize in and the list of clients we have partnered with.
Abate Asbestos Flooring And Pipe Insulation, Building 48-Sector Command Building At U.S.C.G. Sector Key West-Key West, FL.
Scope of Work:
Scope of Work:
Location: Work under this Contract is located approximately 25 miles southeast of Roswell, New Mexico, on the Southwestern Native Aquatic Resources & Recovery Center formerly known as Dexter National Fish Hatchery & Technology Center.
Several of the Fort Detrick residents have reported brown water in their potable water supply. Potable water supplied to the housing area is fed by two 8″ water mains and the piping material throughout housing is comprised of PVC material.
Scope of Work:
The SCOPE OF WORK for the Project includes all Planning, Execution, Transition, and Handoff/Closure of the Installation of Two New Micron Filters.
Tampa, FL-22-012 Replace of Existing Gate, USCG Station Davis Island
The existing operator of the gate reached the end of its useful life. Station Davis Island is requesting a cost estimate to remove the old system and replace in kind with new.
Repair Leak of a three-inch Ductile Iron Pipe, USCG Air Station Clearwater, Clearwater, Florida
NCG is pleased to provide the following quote for the above referenced services, as requested by your office. We are proposing to remove section of three-inch ductile iron pipe outside the medical building and replace with new pipe.
The Contractor shall provide all professional services necessary for the accomplishment of the contract project and such required services shall be in accordance with requirements as described herein. The Contractor shall provide services for the following tasks “Provide a cost proposal and a technical proposal to complete the project as per project requirements. Provide and install all material to complete the project as per project requirements.
The facilities will require complete demolition and site restoration. Contractor shall submit required environmental permits. Contractor will survey and abate asbestos containing material prior to demolition. A 10 day notification form must be submitted to the Florida Department of Environmental Protection. Copies of the survey results and 10 day notification shall be provided to the 325 CES Asbestos Program Manager.
This project consists of providing all labor, equipment, and materials to demolish the Re-locatable buildings located on Oklahoma Ave and Minnesota Ave as identified below in Section II. Work shall also include, but is not necessarily limited to removing the demolished buildings and contents, as required.